Adjustable Flexible Steel Shelving Long Span Bolted Racks Storage Racks Shelving Units Warehouse Racks

Product Description

Company Profile

Profile Image 1
Profile Image 2
Profile Image 3
Profile Image 4
Profile Image 5
Profile Image 6

Product Packaging

Product Packaging

Technical Specifications

Size Number of Layers Loading Capacity Color Options Material Specifications Estimated Price
L100 * D40 * H200 3 Layers
4 Layers
5 Layers
Custom
120Kg / Layer Blue, White, Grey, Frosted Black, Custom Column: 30*50*0.5 C steel
Beam: 30*50*0.45 P steel
Laminate: 0.3 (0.23 bar)
45 to 55 USD/Set
L100 * D50 * H200 47 to 57 USD/Set
L120 * D40 * H200 50 to 60 USD/Set
L120 * D50 * H200 52 to 62 USD/Set
L150 * D40 * H200 55 to 65 USD/Set
L150 * D50 * H200 58 to 68 USD/Set
L180 * D40 * H200 66 to 76 USD/Set
L180 * D50 * H200 -
L100 * D40 * H200 3 Layers
4 Layers
5 Layers
Custom
180Kg / Layer Blue, White, Grey, Frosted Black, Custom Column: 30*50*0.7 C steel
Beam: 30*50*0.6 P steel
Laminate: 0.4 (0.3 bar)
-
L100 * D50 * H200-
L120 * D40 * H200-
L120 * D50 * H200-
L120 * D60 * H200-
L150 * D40 * H200-
L150 * D50 * H200-
L150 * D60 * H200-
L180 * D60 * H200-
L200 * D40 * H200-
L200 * D50 * H200-
L200 * D60 * H200-
Size Number of Layers Load Capacity Material Specifications Color Options
L150 * D50 * H200 3 Layers
4 Layers
5 Layers
200Kg / Layer Column: 40*80*0.5 C steel
Beam: 40*60*0.45 P steel
Laminate: 0.3 (0.3 bar)
Blue, White, Grey, Frosted Black, Custom
L150 * D60 * H200
L200 * D50 * H200
L200 * D60 * H200
L120 * D50 * H200 3 Layers
4 Layers
5 Layers
240Kg / Layer Column: 40*80*0.7 C steel
Beam: 40*60*0.65 P steel
Laminate: 0.35 (0.3 bar)
Blue, White, Grey, Frosted Black, Custom
L120 * D60 * H200
L150 * D50 * H200
L150 * D60 * H200
L200 * D50 * H200
L200 * D60 * H200

Products Description

Description Product View 1 Description Product View 2 Description Product View 3
OEM & ODM Welcome

OEM & ODM WELCOME

  • Product name: Light Duty Racking
  • Size: 200*60*200 = 4 layers (or custom)
  • Suit for: Warehouse Rack, Household, Commercial
  • Loading capacity: 120kg-180kg / layer
  • Upright thickness: 30*50*0.8mm C steel
  • Beam thickness: 30*50*0.8mm P steel
  • Shelf thickness: 0.4mm thick cold rolled steel sheet
  • Feature: Environmental protection spray, Corrosion Protection
  • Color: Blue, White, Gray, Matte Black
The New Light Duty Racking Specifications
Loading Capacity (kg) Shelf Thickness Upright Thickness Beam Thickness
120kg / layer 0.32mm thick cold rolled steel sheet 30*50*0.7mm C steel 30*50*0.6mm P steel
The New Medium Duty Racking Specifications
Loading Capacity (kg) Shelf Thickness Upright Thickness Beam Thickness
120kg / layer 0.32mm thick cold rolled steel sheet 30*50*0.7mm C steel 30*50*0.6mm P steel
Size (cm) Body-frame Weight (kg) Sub-frame Weight (kg) Loading Capacity (kg)
Thicken 200*60*200 = 4 layers44±0.540±0.5180kg/layer
Thicken 200*50*200 = 4 layers41±0.537±0.5180kg/layer
Thicken 200*40*200 = 4 layers39±0.535±0.5180kg/layer
Thicken 180*60*200 = 4 layers41±0.537±0.5180kg/layer
Thicken 150*60*200 = 4 layers37±0.532±0.5180kg/layer
Thicken 150*50*200 = 4 layers33±0.528±0.5180kg/layer
Thicken 150*40*200 = 4 layers30±0.526±0.5180kg/layer
Thicken 120*60*200 = 4 layers30±0.526±0.5180kg/layer
Thicken 120*50*200 = 4 layers27±0.523±0.5180kg/layer
Thicken 120*40*200 = 4 layers25±0.521±0.5180kg/layer
Thicken 100*50*200 = 4 layers25±0.521±0.5180kg/layer
Thicken 100*40*200 = 4 layers23±0.519±0.5180kg/layer
The New 200*50*200 = 4 layers33±0.529±0.5120kg/layer
The New 150*50*200 = 4 layers27±0.523±0.5120kg/layer
The New 150*40*200 = 4 layers25±0.521±0.5120kg/layer
The New 120*50*200 = 4 layers24±0.520±0.5120kg/layer
The New 120*40*200 = 4 layers21±0.518±0.5120kg/layer
The New Medium 200*60*200 = 4 layers49±0.542±0.5240kg/layer
The New Medium 200*50*200 = 4 layers44±0.538±0.5240kg/layer
The New Medium 150*60*200 = 4 layers41±0.534±0.5240kg/layer
The New Medium 150*50*200 = 4 layers37±0.530±0.5240kg/layer
Detail Gallery 1
Detail Gallery 2
Detail Gallery 3
Detail Gallery 4
Detail Gallery 5
Detail Gallery 6
Detail Gallery 7

Frequently Asked Questions

Q: What are your trading and payment terms?
1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A options are also available.
2) Lead time: Normally in 20-25 days after deposit received.
3) Sample policy: Samples are always available for each model and can be ready in 7-15 days once payment is received.
4) Discounts: We offer discounts for large quantity orders.
Q: How can I arrange the delivery of my goods?
1) Sea freight: We will calculate and update the sea freight details once we receive your designated sea port information.
2) Client-appointed agent: Please provide the contact information of your shipping agent, and we will coordinate and arrange the delivery process with them.
Q: What customized services do you offer?
1) All inquiries related to products or pricing will be answered within 12 hours.
2) Well-trained and experienced staff will handle your requests in fluent English.
3) We provide full OEM & ODM services to customize and design racking systems specifically tailored to your needs.
4) Professional and experienced engineering teams are available to construct optimal system layouts.
Q: What is the step-by-step process to purchase your products?
The purchasing process follows these steps: Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → Quality Control (QC) inspection → Balance payment → Shipping arrangement.
Q: What core advantages do you offer?
1) Payment: We can offer O/A 40-60 days payment structures.
2) Lead time: We accept rush orders with fast-tracked delivery.
3) Factory-direct: Competitive, direct factory pricing.
4) Warranty: Two-year warranty coverage, under which damaged parts will be replaced and sent directly to you.
Q: Is there a Minimum Order Quantity (MOQ) limitation, and how are tooling fees charged?
1) MOQ: We do not set a strict MOQ, but larger order volumes offer more competitive pricing. We recommend ordering in volumes that fit at least one 20ft container (approx 15 tons) for optimal shipping rates.
2) Tooling fees: For custom toolings, the initial mold opening costs are charged prior to the first order. These tooling costs can be partially or fully refunded once orders reach a designated quantity.

Related Products