









| Item | Value |
|---|---|
| Place of Origin | China |
| Model Number | ST600-1 |
| Type | Carton Flow System |
| Material | Steel / Stainless Steel |
| Feature | Corrosion Protection |
| Use | Warehouse Rack |
| Depth | 0.4mm |
| Weight Capacity | 300kg |
| Width | 50cm/60cm |
| Height | 120cm/150cm/200cm |
| Usage | Warehouse Storage |
| Product name | Medium Duty Storage Rack |
| Color | Customized |
| Packing | Carton Packing |
| Surface treatment | Powder Coating |
| Size | Customized Size |
| Style | Medium Duty Selective Shelf |
| Design | Customized |
| Layer | 3/4/5 Layers |





1) Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C and O/A options are also available.
2) Lead time: Typically 20-25 days after deposit is received.
3) Sample policy: Samples are always available for each model and can be ready within 7-15 days once payment is received.
4) Discounts: We offer volume-based discounts for large quantity orders.
1) Sea Freight: We will provide updated sea freight rates once we know the specific seaport where your goods will be delivered.
2) Client Designated Agent: Please provide us with the contact details of your shipping agent, and we will coordinate directly with them to arrange the delivery.
The standard process is: Design drawing → Confirm drawing → Quotation → Proforma Invoice (PI) → Confirm PI → Arrange 30% deposit → Manufacture → Quality Control (QC) inspection → Pay balance → Shipping.
1) Flexible Payment: We can offer O/A payment terms of 40-60 days.
2) Quick Lead Time: We can fast-track rush orders for prompt delivery.
3) Factory-Direct Pricing: Enjoy highly competitive direct-from-factory rates.
4) Warranty Support: A comprehensive two-year warranty with free replacement parts provided for any broken components.
No, we do not enforce a strict MOQ. However, larger orders qualify for better pricing. For regular products, we recommend ordering a quantity that fits at least one 20ft container (approximately 15 tons) to optimize shipping costs.